Scope of Work
Site Assembly & Installation Works
- Fluidized Bed Furnace (FBF), 2 Units.
- Air Ducts including Pipe/ Duct Supports
- Air Fans, 6 Units
- Air Preheater
- Waste Heat Boilers (WHB) including platforms, 2 Units
- Waste Heat Boilers Piping
- Flue Gas Treatment
- Silo Group (Steel structure, Silos & Equipment)
- Turbine & Generator Set
- Building Steel Structure (86 and 87) and steel platforms in Building 87 (incl. Handrail and Grating)
- Water – Steam Cycle (Tanks)
- Auxiliary Equipment Installation
Manufacturing and Delivery to Site
- Silo Steel Structure, Silos, Building Steel structure, gratings and handrails
- Air Ducting (incineration air supply)
- Stacks for Flue Gas Treatment
- Stack for Auxiliary Boiler