Project info

  • Construction
  • ALBA

  • ALBA

  • Bahrain

SCOPE OF WORK:

  • Dismantling of existing coke cooler skidded, removed, transported and restored at the ALBA designated area.• Lifting of revamped cooler, transported, skidded and installed at the location.
  • Site structural modification works on attached conveyors, chutes and working platforms to suit re-installation works.
  • Disconnecting the Power and Control cables from the existing system and re-installation.
  • Dismantling of all the Instruments, Junction Boxes, sensors from existing system and re-installation.