SCOPE OF WORK:
- Dismantling of existing coke cooler skidded, removed, transported and restored at the ALBA designated area.• Lifting of revamped cooler, transported, skidded and installed at the location.
- Site structural modification works on attached conveyors, chutes and working platforms to suit re-installation works.
- Disconnecting the Power and Control cables from the existing system and re-installation.
- Dismantling of all the Instruments, Junction Boxes, sensors from existing system and re-installation.